Owner: City of San Diego
Contract Amount: $1,720,000

Carmel Valley Skateboard park

Project Description
A 33, 000 square feet concrete skate park with a 600 square foot cast in place concrete restroom. Park features included an 11 feet deep concrete bowl, shortcrete, stamped concrete, drainage, a new electrical meter, lights, security cameras, fencing, landscape and irrigation. The restroom building consisted of cast in place concrete walls, steel columns, sheet metal roof and built up insulation. A number of design changes took place during the construction phase. 3D-Enterprises worked with the design team and City staff to incorporate the changes and complete the project on time within the allowed 150 construction days. The project was awarded the “Honor Award” by the American public works Association in 2009.

Project Detail
Owner: San Diego Unified School District
Contract Amount: $1,226,000

Laura Rodriguez Elementary School

Project Description
A brand new elementary school for the San Diego Unified School District with McCarthy Builders as Construction Manager. Scope of our work included: Landscape and irrigation including a joint use field belonging to the city of San Diego, fencing, play equipment and play surfacing.

Project Detail
Owner: City of Chula Vista
Contract Amount: $3,400,000

Salt Creek Community Park

Project Description
A 22 acre design-build project teamed with Rudolph & Sletten, as General Contractor and City of Chula Vista as owner. Park features include two tot lots, one for small children and one for older children, six picnic areas with furnishings and shade shelters, three themed bridges with a linking trail system for pedestrians, bicycles, and vehicular maintenance access, a loop trail system with measured jogging trails and par course stations, two basketball courts, two tennis courts, an indoor/outdoor soccer arena with synthetic turf, a concrete skateboard area and a natural interpretive and wetland mitigation area.

Project Detail
Owner: City of Encinitas
Contract Amount: $2,100,000

Leucadia blvd. traffic safety and pedestrian improvements

Project Description
This project was directed by the City of Encinitas to improve pedestrian safety and reduce accidents on Leucadia Blvd. The project consisted of 2 round-abouts on Leucadia Blvd. and miscellaneous work on Vulcan Ave. The scope of work included the construction of storm drains, a full depth street section, Handicapped ramps, masonry walls, decorative concrete, landscape, street lights and traffic signals. This project was the recipient of the “Award of Excellence” from the California Department of Transportation.

Project Detail
Owner: City of San Diego
Contract Amount: $523,252

Design Build of ADA and Title 24 facility improvement phase I

Project Description
Administered by the City of San Diego with Federal assistance under the C.D.B.G. HUD Program. A design-build project to upgrade two facilities to fully comply with the American with Disabilities Act (ADA) and Title 24 requirements. The scope included interior and exterior improvements to the following sites: Swanson Stanley Pool and Memorial Pool

Project Detail
Owner: City of San Diego
Contract Amount: $879,000

Design Build of ADA and Title 24 Facility improvements phase II

Project Description
Administered by the City of San Diego with Federal Assistance under de C.D.B.G. HUD Program. A Design-Build project to upgrade six facilities to fully comply with the American with Disabilities Act (ADA) and Title 2 requirements. The scope included interior and exterior improvements to the following sites: Fire Station 13, Ocean Beach Recreation Center, Mid City Community Gym Facility, Rancho Bernardo Recreation Center, Mira Mesa Teen Center, Scripps Ranch Library

Project Detail
Owner: County of San Diego
Contract Amount: $520,000

San Dieguito Park Miracle Field

Project Description
San Dieguito Park is a 125 acre Park located in Del Mar, CA. The Miracle Field is a fully accessible baseball field that accommodates children and adults with special needs. The field was constructed over an existing water tank with reinforced concrete over it. The field is finished with synthetic turf, asphalt and concrete paving with strict tolerances as base coarse. Other Features included are chain link fence, concrete walk, voice system, landscape, and site furnishing.

Project Detail
Owner: City of San Diego, CCDC
Contract Amount: $2,550,000

Children’s Museum Park

Project Description
This project was a one acre park in Downtown San Diego for the Center City Development Corporation of San Diego. Park features include heavy structural steel shade structures, custom built electrical lights and canopies, cast in place concrete walls, decorative concrete seat walls, fencing, electrical pedestal and lights, play equipment, resilient surfacing, brick pavers, landscape and irrigation. The Structural steel portion of the project was value engineered by 3-D Enterprises with a $170, 000 saving to the owner. This project was awarded the “Merit Award” by the Sand Diego Chapter of American Society of Landscape Architects.

Project Detail
Owner: City of San Diego/Pardee Homes
Contract Amount: $2,590,455

Solana Ranch Park

Project Description
Solana Ranch Park is a new 5 acre Park within Carmel Valley area of San Diego. Pardee Homes acted as the developer for the City of San Diego. Park features include two play equipment sets for 2-5 and 5-12 year olds, structured steel abode structure, prefabricated restroom building with storage area for maintenance, area lights, concrete and D.G., walks with picnic tables and benches, an open bio retention area and rock wall areas were used to filter all storm drains from the park before it enters city storm drain system. The project was completed within 5.5 months allowed by the contract.

Project Detail
Owner: Otay School District
Contract Amount: $1,080,000

Eastlake Middle School

Project Description
A brand new middle school for the Otay School District with Rudolph & Sletten Construction as construction manager. Our scope of work included landscape, irrigation, and a portion of site concrete.

Project Detail
Owner: Grossmont Union High School District
Contract Amount: $2,450,000

Mount Miguel High School Phase II

Project Description
Two separate projects at Mount Miguel H.S. The Infrastructure project scope included removal and replacement of 90% of the site concrete, including seat walls, architectural concrete, ramps, hand rail, brick paving and complete new landscape and irrigation for the High School. This work was completed in 70 calendar days during summer. The synthetic track project was completed in 70 calendar days during the following summer and included new synthetic track around the football field and 3 new restroom/ concession buildings made of block wall and sheet metal roof.

Project Detail
Owner: City of San Diego, CCDC
Contract Amount: $2,320,000

India Street Improvements, Phase II

Project Description
Street improvements to five blocks of downtown San Diego in the Little Italy neighborhood for the City of San Diego. Improvements consisted of new curb, gutter, sidewalk, street pavement, decorative concrete, landscape, irrigation, street lights, traffic signal, site furnishing, striping. This project was completed in ten phases to minimize inconvenience to the owners.

Project Detail
Owner: City of Oceanside
Contract Amount: $1,200,000

North Coast Highway Gateway Improvements

Project Description
Street improvements to North Coast Highway in Oceanside, CA administered by the City of Oceanside within Caltrans right of way. Improvements included curb, gutter, sidewalk, handicapped ramp, ramps, brick paving, rock paving, street lights, low voltage lighting landscaping, decorative sign, asphalt paving and striping.

Project Detail
Owner: City of Chula Vista
Contract Amount: $4.6 million

Third Avenue Streetscape Improvements

Project Description
Street improvements and beautification to eight blocks of downtown Chula Vista on Third Avenue. Improvements consisted of new curb, gutter, mediation curb, decorative and concrete sidewalks, brick pavers in plaza area and cross walks, new street lights, traffic lights, bus shelter, decorative signs, and a new median on Third Ave landscaping. The project was completed in 8 phases with strict coordination with shop owners and city staff.

Project Detail
Owner: San Diego Unified Port District
Contract Amount: $1,012,026

Tenth Avenue and National City Marine Terminals Lighting Improvements

Project Description
Lighting improvements required by the San Diego Unified Port District for two marine terminal locations. Improvements included 18 new High Mast lighting units (90 feet high) and required electrical conduit, power supply, concrete and asphalt paving.

Project Detail
Owner: City of San Diego
Contract Amount: $3,425,000

El Cuervo Wetland Mitigation

Project Description
El Cuervo Norte project consisted of a 27.5 acre site with a 22 acres of wetland and 4 acres of upland mitigation. The scope consisted of heavy grading of the entire site with large quantities of export, the grade was lowered to reach the water table for the wetland area, temporary irrigation, amending the soil for the wetland areas, fencing, planting, hydro-seeding and a five year maintenance period. The project was approved by Fish & Wild Life and Army Corporation of Engineers. Project received “Honor award of the Year” by American Public Works Association in 2006.

Project Detail
Owner: City of San Diego
Contract Amount: $2,450,000

Construction of South Chollas Landfill Slope Modification

Project Description
Improvement to a 31 acre landfill site owned by the City of San Diego. Scope of work included heavy grading with soil import to achieve a minimum of 2 feet of dirt cover over the trash, modification of the gas collection system, new drainage system, mulch and hydro-seeding the slope as a permanent slope protection.

Project Detail
Owner: University of California, San Diego
Contract Amount: $1,121,108

UCSD Temporary Trailers

Project Description
This project was to complete site work and utility requirement for a new 5000 square feet relocatable office building for UCSD La Jolla Campus. Scope included water, sewer, storm drain, electrical MAIN 12kv and building electrical feed, large raised wood decking with ramps and stairs, decorative screen walks and landscape and irrigation. The project was constructed under very limited time frame with coordination among UCSD staff, Building Users (Oncology), Building Contractor, and 3-D Enterprises Staff.

Project Detail
Owner: City of San Diego
Contract Amount: $647,726

Views West Neighborhood Park

Project Description
A design build project to improve ADA accessibility to an existing park for the City of San Diego. The project consisted of design and construction of new accessible path from the street to the new playground area and upper baseball field. Scope included new sidewalk, ramps with railing, ADA parking stalls, ADA approved play equipment for 2-5 and 5-12 year olds. Improvements to the existing restrooms and snack bar were also included in the project.

Project Detail
Owner: City of San Diego
Contract Amount: $3,407,135.52

Torrey Meadows

Project Description
Torrey Meadows Park is a mew 5.3 acre park in the City of San Diego. Its features include: play equipment for 2—5-year-olds & 5—12-year-olds; resistant surfacing; a prefabricated restroom facility; two shade structures; concrete and DG; walkways; site furnishing; park area lighting; landscape; and irrigation.

Project Detail
Owner: UCSD
Contract Amount: $2,396,953

UCSD: Outpatient Pavilion

Project Description
3-D Enterprises, Incorporated acted as Landscape & Site Concrete authenticator with Rudolph & Slette as General Contractor for UCSD. The project included: decorative concrete walks. DG; walkways — both precast and cast-in-place; seat walls; concrete ramps & stairs; cast-in-place walls; landscape; and irrigation The schedule was very short & required meticulous coordination amongst all team players.

Project Detail
Owner: City of Santee
Contract Amount: $10,480,810.73

Mast Park

Project Description
This renovation of the existing 15 acre park located in the City of Santee included the following features: Basketball court; play area for 2—5 & 5—12-year-olds; Discovery area; exercise equipment; three picnic pavilions with benches and BBQ area; three dog parks for different sized dogs; a disc golf course; restroom/storage building(s); snack bar/concession stand; Concrete and DG walkways with a series of bridges & winding river beds.

Project Detail
Owner: UCSD
Contract Amount: $2,154,445

UCSD: Jacobs Medical Center

Project Description
3-D Enterprises acted as Landscaping sub-contractors with ... General Contractor for UCSD. Our scope included: landscape & irrigation of the site — approximately 1.5 acres; landscape of several courtyards and terraces on the 13th & 7th floors which held special light-weight soil potted trees. Our work also included: unit pavers; gravel walks; reinforced gravel pavement & a screen wall on two terraces.

Project Detail
Owner: City of San Diego
Contract Amount: $14,997,000

César Solis Community Park

Project Description
A 15 acre community park and r=the renovation of a 5 acre joint-use field for the city of San Diego. Some key features included: a 15,000 ft.² concrete skate park; several shade structures with respective picnic amenities; two baseball fields with sport lighting; a soccer field; Concrete DG walkways; two sets of play equipment; decorative seat walls; permanent storm pollution features; a 2000 ft.² restroom & office building.

Project Detail
Owner: City of San Diego
Contract Amount: $78,144.97‬

Sweetwater Bicycle Path & Promenade

Project Description
Construction of a 3000 ft. bike path for the Port of San Diego, in Chula Vista Bay Area. Its features include: a 16' asphalt bike path — with an additional 8' wide DG path for pedestrians; a 71' pedestrian bridge, and natural landscape

Project Detail
Owner: City of San Diego
Contract Amount: $904,661.52

Centrum Park

Project Description
This project encompassed both design & renovation elements of the City of San Diego's 2.2 acre park nestled in Kearny Mesa. Some Park features include: two shade structures & two dog park areas