Project Description:
A 33, 000 square feet concrete skate park with a 600 square foot cast in place concrete restroom. Park features included an 11 feet deep concrete bowl, shortcrete, stamped concrete, drainage, a new electrical meter, lights, security cameras, fencing, landscape and irrigation. The restroom building consisted of cast in place concrete walls, steel columns, sheet metal roof and built up insulation. A number of design changes took place during the construction phase. 3D-Enterprises worked with the design team and City staff to incorporate the changes and complete the project on time within the allowed 150 construction days. The project was awarded the “Honor Award” by the American public works Association in 2009.