Project Description:
Improvement to a 31 acre landfill site owned by the City of San Diego. Scope of work included heavy grading with soil import to achieve a minimum of 2 feet of dirt cover over the trash, modification of the gas collection system, new drainage system, mulch and hydro-seeding the slope as a permanent slope protection.